On-line support Build-up
UNI-2000 system build-up /
ULTRA-STAR 2000 build-up       Page 8
Even though our mechanics are going to find their permanent home in our new
Agusta A-109E POWER Model we will test fly and tune with the Ultra-Star 2000
pod and boom kit to finish things off. Our fuse comes back from paint very soon
so this was prepared in about a day to fully  rig everything.


Ultra-Star 2000 kit shown here. which includes change over gears for tail box,
articualted ballraced tail drive and wonderfully finished pod and fin set . All other
hardware is included. Carbon fiber boom supports and tail pushrod standard.
shown below.

...

...
Standard length servo wires make it with NO extensions needed! GY-502 finds a good spot on the gyro tray.

..
Landing gear added, note spacers up front. Here is glo-plug access with everything in place.
 

...
Rear vertical stab has offset built in. Here is shown the cut out to acess switch and needle valve with removing
canopy. No painting is required . Available in white only now.

 
Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
Page 10 final chapter / Flying shots

© copyright 2003 V-EAST.
Any reproduction \copy of the images or text on this website is strictly prohibited.

V-East
    P.O Box 35-7684
Gainesville, Fl
U.S.A
32635-7684
      352-371-3132 ph.

      V-East Main Page