On-line support Build-up
UNI-2000 system build-up Page 7
...
![]()
The main tailbox parts along with the optoinal input shaft and gear that comes with the rigid-boom conversion kit.
We are going to run the articulated system so the wire drive input goes on the shelf.This kits comes with a bg of
extra shims and enough to clearance the model for a lifetime! I only needed one thin shim and the gearbox was perfect.
Test fit mesh beofre lockite, then when you are sure its good, clean and locktite with 242 locktite.
...
![]()
White tri-lithium high pressure grease in box.Here just a spot of 603 to lock set screw into place securely.
...
![]()
Fully ballraced bellcrank and slider assembly, note brass threads for bellcrank and locknut used.
..
![]()
The tail hub parts are next along with unique thrust bearings and safety/fully dampend hub. Grease all bearings
during assembly. No shims needed here.
![]()
A very robust system... 2.5 mm rods throughout
and HUGE Blade grips as standard.Fully ballraced
pitch compensator andmixer arms standard also.
![]()
Finished tail hub.. we will now stripe and balance
the blades.. note: pin lines up with pitch arm and bladegrip
as exra safety precaution.Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
© copyright 2003 V-EAST.
Any reproduction \copy of the images or text on this website is strictly prohibited.V-East
P.O Box 35-7684
Gainesville, Fl
U.S.A
32635-7684
352-371-3132 ph.