Modellsport AS-350b Turbine 2.3m continued (page 3)......
![]()
Some more detail of attachments machined from brass stock. The final install!
......
![]()
This is the mirror bracket completed less mirrors. Everything is silver soldered for extra strength. There is also
a hidden brace in the nose that makes the whole system very rigid (you can't see it in these picks).
.....
![]()
The fuel system layout...2 liters plus BVM air trap. Fuel shut-off valve is easily accessible from step pocket.
.......
![]()
The general layout, this will be totally hidden by cockpit firewall. BVM Ultimate air trap is set at the recomended 20
-degree angle.
.................
![]()
Gas and Kero ports are located in the luggage bay door. Cable cutter in progress made from 1/64th ply layers
Over flow dump can be seen in the background on the and sheet fiberglass (brass blade in center).
floor (scale location).
..
![]()
The re designed pipe made by TamJets in California, I am quite happy with Cable cutter completed.
this final design as it will have zero restriction!
......
![]()
Step pocket completed and bypass added. All windows are dry-fit before painting. These were
very carefully cut from the door skins previously.
Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
© copyright 2006 ScaleJet International.
Any reproduction \copy of the images or text on this website is strictly prohibited.ScaleJet International
P.O Box 35-7684
Gainesville, Fl
U.S.A
32635-7684
352-371-3132 ph.