Presents: Bell 230  UT  online support build-up. Page 7
 
.....
Before all detail work, the total time to build her was about 25 hours. The details
I am adding are for my own enjoyment and add many hours to the job. One can go without
this and be flying in 25 hours from start to finish !!!
 

......
      Enjoy the details as they develop...

....
Panel line added to nose,and luggage area... all the rest are there already.
 

......
      This is my own fuel filler system , it cant leak!  available from central hobbies the FUEL
DOT  is the scale way to get it done. A loop of fuel line to motor is pinched off for refueling.
No valves to malfunction. I made these navigation light bezels by angle cutting some
plastic drinking straw (wal mart) . Jb weld them on and reshape lens as needed.

......
    Scale appointments added to scoop area. This area for starter is filled since I use the pegae
system for starting.  A trick door is on the way ....
 

Pages
 1    2    3           6    

 8     9  10  11  12  13  14

Back to build-ups.



© copyright 2000 V-EAST.
Any reproduction \copy of the images or text on this website is strictly prohibited.

V-East
    P.O Box 35-7684
Gainesville, Fl
U.S.A
32635-7684
      352-371-3132 ph.

  V-East Main Page