Turbine NH-90
  On-line support Build-up / Page 9

Turbine Q&A/Addtional support products section here.

Corrections and Addendums here.

...
 The rear bulkhead is placed with slight forward tilt at the top, take care it does'nt push on the driveshaft when fully installed.
Here is the rear servo plate roughed together...
 

...
Sanded ready for action and shown here installed... I will wait on the servo install until I paint the wood.

...
Tail rotor 60 degree bellcrank control and some pushrod parts... shown here in sequence, trim the ball off as it is not needed.

....
  dDrill a point 20 mm from the corner of fin recess, add wood strip, Drill and countersink hole on the outside and install
as per plan. I will add some more supports here later....

...
  Servo bulkhead positioned correctly. Tail control pushrod matierals shown here, we use JB weld to make up the ends
on the carbon rod. More on this later...

...
   The rod is notched up a bit and sanded to promote better grip, use JB weld to build pushrod. I mark the length I need and
use pins to hold until dry.

...
 The pushrod installed with ball, note the glass work here as well, also I added 3 mm blind nuts to the back side. Here
are the door parts (only one wire is used, the rest of the four pieces we use to make step plates later).
 
Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
Page 10
Page 11
Page 12
Page 13
Page 14
Page 15
Page 16
Page 17
Page 18



© copyright 2000 V-EAST.

Any reproduction \copy of the images or text on this web site is strictly prohibited.

V-East
P.O Box 35-7684
Gainesville, Fl
U.S.A
32635-7684
352-371-3132 ph.