Turbine NH-90
  On-line support Build-up / Page 6

Turbine Q&A/Addtional support products section here.

Corrections and Addendums here.

...
The front bracket is carfull fitted to fuse contour and then drilled while clamped, checked, tacked in place, then everything
lifted out for final glue-up. I also used some very light cloth here, .75 oz. both sides with thin CA.


 Ok, we are in! Next task is fit the cowl to the exhaust once I am sure it is where it should be...


The business end of things.

...
Here are the stacks BEFORE fitting!                                              leave from 2-5 mm clearance.
...
Overhead view shows a better shot of clearances...                Round off trimmed brackets, back up glass underneath with
                                                                                            some 1/8" ply scrap.

...
 Fuel tank mount:
From the front reference line measure 100 mm forward. Drill a 7.5 mm hole and back up underneath with some scrap ply.
JB weld or epoxy the metal nut to the wood after it has sanded for good grip. Align the screw in the center of the cap if
possible.
 
Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
Page 10
Page 11
Page 12
Page 13
Page 14
Page 15
Page 16
Page 17
Page 18



© copyright 2000 V-EAST.

Any reproduction \copy of the images or text on this web site is strictly prohibited.

V-East
P.O Box 35-7684
Gainesville, Fl
U.S.A
32635-7684
352-371-3132 ph.