Turbine NH-90
On-line support Build-up / Page 5
![]()
Turbine Q&A/Addtional support products section here.
Corrections and Addendums here.
...
![]()
Starting from the this line back 177 mm we make the second mark, Here is where the main bearers will be postioned.
We line up the outer edge of wood with the outer edge for the flange. Here both brackets must be in the "same plane"
with each other. Once sure of thier position I tack then glue them in using thin CA glue, followed by a bead thick later.
...
![]()
Four of these A-22 blocks get stacked to produce this stout mounting block. Here is Wolfgang means by the blocks being
shaped as deep into the flange as possible. Tack them each other once fit, then remove and cut off excess on a saw, then
they can be installed permanently with thin CA first to soak them in, then thick CA later.
...
![]()
It should look like this...(not glued in yet). Next we move onto the Turbine unit install using this hardware pack. The spigots
as refered to in the text are the steel spacers shown here.
...
![]()
Add Jb weld to throughly cleaned 4mm bolt once you locate your holes as per the drawing in the manual, the bolts will
protrude 4 mm as shown here when fully tightened with spacer.
...
![]()
I I chose to thread my holes for added safety against them turning out. Clean all parts with acetone, sand the bottom of spacer
and glue in with JB weld and tighten fully, very snug!
..
Bolt up the rear bracket , which should fall on, and let dry..
![]()
Both brackets added to mechs ready for the next step...
Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9Page 10
Page 11
Page 12
Page 13
Page 14
Page 15
Page 16
Page 17
Page 18
© copyright 2000 V-EAST.Any reproduction \copy of the images or text on this web site is strictly prohibited.
V-East
P.O Box 35-7684
Gainesville, Fl
U.S.A
32635-7684
352-371-3132 ph.