Turbine NH-90
  On-line support Build-up / Page 4

Turbine Q&A/Addtional support products section here.

Corrections and Addendums here.

...
Center to center distance from ball to servo screw is 8 mm. This is correct way to install the servo grommets to ensure
that they do not get crushed when tightening. (JR super servos are used.)

...
Here is everything bolted up for testing and final test fit... I will remove the eletronics for gluing into the fuse, but for now
I will leave it out so I can see the better for the next steps...especially the main mechanic bearer blocks.

...
There are the gas and kerosene recepticle plates and wood supports, the GAS side with bracket is for the left side. Later
quick-release fittings get installed. I choose to use JB weld to bond alu to the wood and bed down the gas bracket in this
case. Round off the sharp edges so that when you intsall in the fuse you simply cut out the hole and blend it in with some
220 sandpaper.

......
Here are the plates installed (Lower part of pic facing front)  It's a good idea to smooth everything over to prevent the
accidental cut or rub of a fuel line.

....
Now, on the Turbine install: We start with these brackets and position shims as shown. Use a right angle to square up tab
to bracket then add shim...

...
IMPORTANT! make two mirrored sides!  We then use flexible ruler to achieve the Main reference line from which all
measurments for brackets are made. We use the front door edge for this....
 
Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
Page 10
Page 11
Page 12
Page 13
Page 14
Page 15
Page 16
Page 17
Page 18



© copyright 2000 V-EAST.

Any reproduction \copy of the images or text on this web site is strictly prohibited.

V-East
P.O Box 35-7684
Gainesville, Fl
U.S.A
32635-7684
352-371-3132 ph.