..

                 Dauphin N-4 build-up
                                                            presented to you by  Sandy Alan Squitieri  .PAGE 5



                                . ..       . .

                                     Ok, now that we have the fuse in order for now lets move to the tail. We must first
                                   address the fins...."hello fins!" . seriously , they must be done first in order to have room
                                   to work before installing bearing supports for tail drivshaft. I am utilizing a carbon drive-
                                   shaft to create a support spar for the horizontal stabilizers.Lite ply bulkheads are fashioned
                                   to susspend the spar mid-way in the hole for stabs. There must be a gap all the way around
                                   stab to appear scale.
 

                                  ..        ..
                                       HHere is the general idea... tack in with c/a glue vey lightly then epoxied in palce with
                                   micro-ballons mixed in with epoxy..glued in from inside! we want it clean outside. 3/32
                                   strip balsa is tacked with c/a to sanded shaft/spar and then shaped as to not distort the
                                   skin of the stab at all, just contact it lightly.

                                 ...     .  ..
                                   I then taper the strips near the inside so as to provide addtional clearance  for the next step.
 


Back to main page
Back
Page 6
 

© copyright 2000 V-EAST.
any reproduction \copy of the images or text on this website is strictly prohibited.