PROJECT: Turbine BK-117 Page 3
......
![]()
Fuel and switch console installed and propane canister is in place waiting for final hook ups.
The rotor brake is installed and the rear portion of the brackets for my mount is in place. Now we just
..
![]()
need to add exhaust and we are almost there!
...
![]()
Tail rotor servo braket slides into place and is held with two screws similat to the NH-90 layout. Also Similar
is the fuel tank layout. A simple zip ties secures the tanks into their pockets. Light control box can be seen
in the lower left hand corner of the picture. I still need to cover some wires in order to finish routing everything.
...
![]()
E.C.U. is in seperate compartment, Gyro and reciver go in the other side. This cover protects it all.
![]()
Exhaust is coming next weekl so we are closing in fast! More to come...© copyright 2003 V-EAST.
Any reproduction \copy of the images or text on this website is strictly prohibited.V-East
P.O Box 35-7684
Gainesville, Fl
U.S.A
32635-7684
352-371-3132 ph.